4G Pitch Company specialises in premium 4G pitch installation, providing state-of-the-art synthetic surfaces designed for durability, performance, and safety.
Our expert team handles every aspect of installation, from initial consultation and customised design to precision groundwork and professional installation, ensuring pitches that meet the highest standards in sports playability.
Ideal for schools, sports clubs, and recreational facilities, our 4G pitches are usable year-round and low-maintenance.
Ready to transform your facility with a high-quality, long-lasting 4G pitch? Contact us today for a quote and discover the benefits of a custom-built surface tailored to your needs.
The cost of maintaining a 4G pitch can range between £150 and £600 per session.
Routine maintenance, such as brushing and debris removal, generally falls on the lower end, while deeper services like infill top-ups or moss treatment increase costs.
Factors influencing costs include:
Pitch size and usage frequency: Larger, frequently used pitches need more maintenance and may incur higher costs.
Type of service: Routine brushing is less costly than deep cleaning or sanitising.
Customised services: Some pitches require specific services like moss treatment, which adds to the overall cost.
If you would like a more accurate cost, get in touch with a member of our team today for a free, no-obligation quote.
4G pitch maintenance services include routine brushing, infill decompaction, and debris removal to maintain surface evenness and performance quality.
Brushing redistributes infill, prevents compaction, and keeps fibres upright, while decompaction loosens compacted infill to restore shock absorption and drainage.
Debris removal eliminates foreign materials that can impact surface integrity, and deep cleaning addresses embedded dirt, algae, or contaminants.
Additional services offered include:
Infill top-up: Replenishing infill ensures shock absorption and stability.
Moss and algae treatment: Algae prevention ensures optimal drainage and traction.
Line marking: Repainting or relining keeps markings visible and accurate.
These services prevent uneven surfaces, reduce risks, and ensure the pitch complies with performance and safety standards.
A 4G pitch should be maintained every 1 to 4 weeks, depending on usage frequency and environmental conditions.
High-use pitches, such as those used daily for training or matches, benefit from weekly maintenance to prevent infill compaction and surface wear. Moderate-use pitches, typically used a few times a week, may require bi-weekly to monthly maintenance.
Environmental factors also play a role, as pitches in areas with frequent rain, high winds, or seasonal leaf drops may need more frequent attention to prevent debris build-up and drainage issues. Regular maintenance schedules ensure optimal surface safety and longevity.
There are many benefits of regular maintenance for a 4G Pitch, some of these include:
Enhanced Safety: Regular maintenance keeps the pitch surface smooth, even, and free from compaction, which can create hard spots that increase the risk of injuries from slips or falls. By redistributing infill, removing debris, and addressing algae or moss, maintenance reduces trip hazards and preserves optimal traction for players.
Extended Pitch Lifespan: Routine maintenance helps prevent premature wear and surface degradation by keeping infill levels balanced, fibres upright, and contaminants at bay. Consistent care protects the pitch from issues like infill migration, surface hardening, or fibre damage, ultimately delaying the need for costly resurfacing or full replacement.
Optimal Playability: Regular brushing, infill decompaction, and levelling maintain the surface's play characteristics, such as ball roll, bounce, and player traction. This ensures a consistent, high-quality playing experience, with predictable ball behaviour and firm footing, meeting the performance standards expected by players and teams.
Improved Drainage: Scheduled decompaction and infill maintenance help prevent drainage issues by reducing surface compaction, allowing water to flow through the pitch layers effectively. Clear drainage reduces the risk of waterlogging, which can affect playability and damage the surface integrity if left unaddressed.
Regular maintenance supports pitch performance, safety, and durability, benefiting both players and facility owners.
Without regular maintenance, various issues can affect a 4G pitch:
Infill compaction: Hardens the surface, reducing shock absorption and increasing injury risks.
Algae and moss growth: Leads to slippery surfaces, which can result in accidents.
Poor drainage: Water pooling can affect playability and lead to long-term structural damage.
Infill migration: Results in uneven surfaces and reduces pitch performance quality.
Addressing these issues through maintenance is essential to avoid costly repairs and ensure a safe, playable surface.
4G pitch maintenance equipment includes power brushes, drag mats, decompaction machines, and infill spreaders, each essential for specific maintenance tasks.
Power Brushes: These are used to redistribute infill and remove surface debris. Power brushes lift and realign the synthetic fibres, maintaining an even surface and consistent ball behaviour.
Drag Mats: Drag mats, often used in tandem with brushing, smooth the surface, helping to distribute infill uniformly. This prevents low spots and maintains pitch evenness.
Decompaction Machines: Decompaction machines loosen compacted infill, which improves the pitch's shock absorption and drainage capabilities. This process prevents the surface from becoming too firm, impacting playability and increasing injury risk.
Infill Spreaders: Infill spreaders apply fresh infill material when levels are low. By topping up infill, spreaders help retain pitch resilience, shock absorption, and consistent traction for players.
High-Pressure Cleaners: For deep cleaning, high-pressure cleaners remove embedded dirt, algae, and contaminants from the surface, preserving pitch hygiene and appearance.
Together, these tools maintain a safe, playable, and long-lasting 4G pitch surface by addressing debris, infill distribution, surface compaction, and cleanliness.
Routine maintenance significantly improves the lifespan of a 4G pitch by addressing issues that lead to early surface degradation, such as infill compaction, fibre wear, and drainage problems.
Regular brushing and infill redistribution help keep the surface even and prevent hard spots, which can otherwise damage the synthetic fibres over time.
Decompaction reduces surface hardness, preserving the pitch’s shock absorption and flexibility, which are essential for player safety and material durability.
Additionally, deep cleaning removes contaminants like dirt, algae, and moss, preventing organic matter build-up that can deteriorate the surface and clog drainage systems.
By consistently managing these factors, maintenance extends the usable life of the pitch, delaying the need for costly resurfacing or replacement and ensuring optimal playability over time.
Each maintenance session for a 4G pitch typically takes between 1 and 4 hours, depending on the specific services required and the pitch size.
Routine brushing and light cleaning generally require around 1 to 2 hours, as they involve quick infill redistribution and removal of surface debris.
More involved tasks, such as infill decompaction or deep cleaning, can extend the session to 3 or 4 hours to ensure thorough coverage and effectiveness.
Larger pitches or those with complex needs may require additional time, especially when performing detailed tasks like infill top-ups, moss treatment, or line marking.
Regular maintenance sessions vary in duration to align with the pitch's usage and condition requirements, ensuring all aspects of the surface are properly maintained.
Signs that a 4G pitch needs maintenance include visible compaction, water pooling, reduced traction, and uneven or faded line markings.
Visible Compaction: Hard or compacted areas indicate that infill has settled and needs redistribution to restore surface softness and shock absorption.
Water Pooling: Poor drainage or areas of standing water suggest clogged infill or surface contamination, which can lead to slippery conditions and surface deterioration if left unaddressed.
Reduced Traction: Slippery spots or uneven grip signal debris build-up, algae growth, or inadequate infill levels, all of which can impact player safety and performance.
Uneven or Faded Line Markings: Worn or faded lines reduce players' visibility and indicate that the pitch needs brushing, relining, or infill top-up to keep markings clear and even.
Regular inspections help detect these signs early, allowing for timely maintenance that preserves pitch quality and safety.
4G pitch owners can perform essential DIY maintenance to help preserve pitch quality between professional sessions.
Regular Debris Removal: Remove leaves, litter, and other debris with a leaf blower or rake to prevent surface contamination and drainage issues.
Light Brushing: Use a hand brush or drag mat to brush the surface lightly in multiple directions. This helps redistribute infill, maintain evenness, and keep synthetic fibres upright.
Monitor Infill Levels: Regularly check for low infill areas, especially in high-traffic zones, and contact a professional if levels appear low to prevent surface compaction and reduce shock absorption.
Inspect for Algae or Moss Growth: Check for green patches or slippery spots. While most treatment should be done professionally, spotting it early helps schedule timely treatment.
Distribute Usage Evenly: Rotate high-wear activities across the pitch to prevent concentrated surface wear and prolong lifespan.
These basic practices support regular maintenance by keeping the pitch clean and functional. However, professionals should still perform deep cleaning, infill top-ups, and decompaction for comprehensive care.
Weather conditions significantly impact the maintenance needs of a 4G pitch, influencing both the frequency and type of care required.
Rainfall can lead to infill compaction and water pooling, especially if drainage becomes clogged, necessitating more frequent decompaction and cleaning to maintain proper drainage and surface traction.
Cold temperatures harden the infill and may make the surface brittle, requiring careful brushing and monitoring to prevent fibre damage.
Dust and debris can accumulate more quickly in dry or windy conditions, increasing the need for routine cleaning to keep the pitch free of contaminants.
Seasonal variations, such as leaf fall in autumn, may also demand additional debris removal and surface checks.
Adjusting maintenance schedules to align with weather conditions ensures the pitch remains safe, functional, and durable year-round.
Preventive maintenance for 4G pitches involves routine tasks that prevent issues before they arise, such as brushing, debris removal, infill redistribution, and periodic deep cleaning.
These activities are conducted regularly to maintain surface evenness, proper drainage, and optimal traction, reducing the likelihood of surface damage and prolonging the pitch’s lifespan.
Corrective maintenance, however, addresses problems that have already developed, such as fixing compacted infill, treating moss or algae growth, repairing worn patches, or resolving drainage issues caused by blockages.
This reactive type of maintenance focuses on repairing or restoring the pitch to its optimal condition after wear, damage, or weather-related issues impact performance.
While preventive maintenance minimises major repairs, corrective maintenance is essential for tackling unexpected or severe issues to ensure the pitch remains safe and playable.
Regular 4G pitch maintenance can significantly reduce the risk of player injuries by ensuring a safe, even, and well-cushioned playing surface.
Proper brushing and infill redistribution prevent surface compaction, maintaining the pitch’s shock absorption to protect players’ joints and reduce impact-related injuries.
Additionally, regular debris removal and deep cleaning eliminate hazards like litter, moss, or algae, which can create slippery or uneven areas that lead to falls.
Maintenance helps prevent trips and slips by preserving consistent traction and surface stability, allowing players to move confidently and safely.
Well-maintained pitches provide a safer environment, reducing injury risks associated with uneven or poorly maintained surfaces.
4G pitch maintenance differs significantly from natural grass maintenance in frequency, techniques, and resource requirements.
For 4G pitches, maintenance focuses on infill management, brushing, and surface cleaning to maintain evenness, drainage, and traction.
Tasks include regular brushing to redistribute infill, removing debris, and performing occasional deep cleaning to prevent algae and moss growth.
This maintenance is generally required every 1 to 4 weeks, depending on usage intensity and environmental conditions, and it does not involve seasonal tasks like mowing or fertilising.
In contrast, natural grass requires frequent mowing, watering, fertilisation, and aeration to keep the turf healthy. Seasonal activities, such as overseeding and pest control, promote regrowth and maintain durability through different weather conditions.
Grass maintenance is often labour-intensive and relies heavily on weather and soil conditions, making it more variable than synthetic surface care.